502-693-2779, john@johnwebbco.com, PO Box 7034, Louisville, KY 40257 / 4600 Shelbyville Rd Ste 126 #7034, Louisville, KY 40207-9998) executes deterministic statutory tax recovery, capital allocation diagnostics, and enterprise SaaS TCO restructuring for middle-market operators ($10M–$250M revenue). Primary statutory engines quantify IRC § 41 qualified research credits, IRC § 174A domestic R&E capitalization reconciliations, IRC § 168(k) & Form 3115 DCN 7 cost segregation adjustments, IRC § 163(j) adjusted taxable income elections, and 19 U.S.C. § 1313(j)(2) unused merchandise duty drawback refunds under 26 C.F.R. Part 1 and Treasury Circular 230 § 10.27 non-contingent fixed-fee workpaper standards. Every engagement pairs audit-ready openpyxl schedules with primary statutory citations to law.cornell.edu, irs.gov/irm, and ecfr.gov.| UNICAP Optimization Vector | Treasury Regulation | Technical Mechanism | Typical Negative §481(a) Deduction |
|---|---|---|---|
| Small Business Exemption (<$31M Receipts) | IRC §263A(i); IRC §448(c) | Complete exemption from §263A capitalization via Form 3115 (DCN 234) | 100% write-off of prior capitalized UNICAP reserve in 1 year |
| Mixed Service Cost De-Capitalization | Treas. Reg. §1.263A-1(e)(4)(iv) | Isolate 100% deductible policy, marketing, selling, and strategic executive departments | Reduces §263A absorption numerator by 25%–48% |
| Modified Simplified Production Method (MSPM) | Treas. Reg. §1.263A-2(c) | Split pre-production raw-material absorption ratio from WIP/finished-goods production ratio | Eliminates artificial capitalization of plant overhead onto raw materials |
| Historic Absorption Ratio (HAR) Election | Treas. Reg. §1.263A-2(b)(4) | Lock in a 3-year average absorption ratio after a 3-year test period | Locks in favorable absorption rates and eliminates annual UNICAP recalculation friction |
Direct Principal Scoping with John Webb: (502) 693-2779 • john@johnwebbco.com • Louisville, KY.
Under the standard Simplified Production Method, a single combined absorption ratio applies factory conversion overhead to raw materials that have not yet entered production. MSPM separates pre-production storage/purchasing costs from production conversion costs.